1. Braywick Road, Maidenhead - Proposed Signal Controlled Crossing

Following a recent petition that raised concerns about a lack of crossing facilities on the A308 Braywick Road, the council has agreed to fund a new signal controlled crossing on this road. It is proposed that the new crossing would be in place prior to the opening of the new leisure centre, which is scheduled for summer 2020.

Two options for the location of the new crossing have been assessed – a northern option opposite the pedestrian access to Braywick Park (south of the Stafferton Way roundabout) and a southern option that would be midway along the Braywick Road, adjacent to the traffic access to Braywick Park. This option is the preferred location as it would be directly opposite the new leisure centre and would be best placed for those walking or cycling to the new centre.

To view a plan showing the proposed crossing in greater detail, please see Braywick Road Proposed Crossing plan.

We are keen to hear the views of residents on the proposed scheme and feedback received will be a key consideration in the decision about the new crossing.  Please have your say by completing the Braywick Road Crossing survey.

The consultation will close on Sunday 14 April 2019.

Thank you for taking your time to complete the survey.